Ver Mensaje Individual
  #2  
Viejo 15/11/18, 18:35:25
Ferchin54 Ferchin54 is offline
Senior Member
 
Fecha de Ingreso: may 2008
Localización: Colombia
Mensajes: 673
Relación entre ETM y PM

He realizado una consulta en internet y expresa integración total entre ETM y PM. Asi que asegúrate con tu consultor de ETM que ello se dé. Anexo copia de lo que encontré en internet.
Purpose
Equipment and Tools Management (ETM) deals with issues that secure an optimal process flow in enterprise areas of (construction) companies or equipment rental companies, and so on, in aspects such as planning, processing, settlement and evaluation of resources (materials and equipment).

Integration
If you want to use ETM, you must have the application components Sales and Distribution (SD), Plant Maintenance (PM), Financial Accounting (FI) and Controlling (CO). To make full use of the integrative nature of the SAP R/3 System, it is also advisable to use the application components Asset Accounting (AA) and Project System (PS).

Features
· Representation of various catalogs containing equipment, machinery, tools, accessories and attachments and so on

· Catalog BOMs (bills of material)

· Shipping and settlement packages

· Relationships between owners and administrators of equipment

· Shipping and performance-based equipment (PBE) documents

· Settlement calendar

· Filler calendar for PBE

· Time-based or performance-based settlement

· Inventory management

· Equipment planning

· Evaluations and reporting functions (settlement lists, statements of usage, stock lists for construction sites and so on)
__________________
Fernando Díaz C
Consultor Certificado SAP PM y Gestión Mantenimiento
Responder Con Cita